Construction Administration and Inspection ServicesIndianapolis DPWKessler Boulevard Storm Water Improvement Project |
This project involved the installation of approximately 7,600 L.F. of 12 inch thru 42 inch storm pipe along the the following areas:
The project included an outfall into Crooked Creek, a storm water quality structure, side ditch grading, pavement patching, and restoration within the limits of construction. The existing storm system was demolished by removing the pipes and structures, except the pipes under Kessler which filled with cellular grout. CMID provided Construction Inspection Services |
- Click on thumbnail for larger image and viewing panel.